Wind Projects in the Maine Interconnection Queue
Snapshot of 2026-09-07 · 124 projects
124 wind projects are in the interconnection queue with a Maine location, totaling 12,618 MW across the 123 that publish a capacity.
See what moved in wind in Maine each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in wind in Maine, from new entries to projects that came off the list.
Email me wind in Maine queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 124 | 12,618 MW |
By status, as published
| Status | Projects |
|---|---|
| (not published) | 124 |
Top counties
| County | Projects | Capacity |
|---|---|---|
| Aroostook | 28 | 7,414 MW |
| Franklin | 24 | 1,869 MW |
| Penobscot | 15 | 245 MW |
| Oxford | 14 | 382 MW |
| Somerset | 13 | 975 MW |
| Washington | 10 | 467 MW |
| Hancock | 7 | 455 MW |
| Aroostoock | 3 | 264 MW |
| Lincoln | 3 | 34 MW |
| N/A | 2 | 400 MW |
| Penobscot/Washington | 2 | 101 MW |
| Peneobscot/Washington | 1 | 0 MW |
| Peneobscot | 1 | 0 MW |
| NA | 1 | 12 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | County | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|---|
| Wind | ISO-NE | Aroostook | 905 | not published | 5/3/2022 | 12/9/2026 |
| Wind | ISO-NE | Aroostook | 630 | not published | 7/26/2017 | 12/31/2022 |
| Wind | ISO-NE | Aroostook | 601 | not published | 6/19/2014 | 12/30/2018 |
| Wind | ISO-NE | Aroostook | 601 | not published | 6/19/2014 | 12/30/2019 |
| Wind | ISO-NE | Aroostook | 601 | not published | 4/12/2018 | 12/1/2021 |
| Wind | ISO-NE | Aroostook | 601 | not published | 4/12/2018 | 12/1/2021 |
| Wind | ISO-NE | Aroostook | 500 | not published | 1/7/2022 | 11/28/2025 |
| Wind | ISO-NE | Aroostook | 500 | not published | 1/10/2022 | 11/27/2026 |
| Wind | ISO-NE | Aroostook | 376 | not published | 12/14/2016 | 12/1/2019 |
| Wind Project-Phase 4( MPS Queue # 8) | ISO-NE | N/A | 250 | not published | 4/14/2008 | 9/1/2013 |
| Number Nine Wind Farm | ISO-NE | Aroostook | 250 | not published | 4/25/2013 | 10/31/2021 |
| Wind | ISO-NE | Hancock | 250 | not published | 12/19/2014 | 12/1/2021 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.