Snapshot of 2026-08-06 · 37 projects
37 solar projects are in the interconnection queue in Imperial County, California, totalling 8,856 MW across the 37 that publish a capacity.
Get told what moves in solar in Imperial County, California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Imperial County, California: what entered, what moved study phase, what came off the list.
Email me solar in Imperial County, California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 37 | 8,856 MW |
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 37 | 8,856 MW |
| Status | Projects |
|---|---|
| WITHDRAWN | 28 |
| COMPLETED | 7 |
| ACTIVE | 2 |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| SUNCREST IMPERIAL SEGS | CAISO | 1,080 | WITHDRAWN | 2011-03-31 | not published |
| GIGANTES SOLAR | CAISO | 726 | WITHDRAWN | 2016-05-02 | not published |
| SILVER RIDGE MOUNT SIGNAL | CAISO | 600 | ACTIVE | 2006-08-22 | not published |
| OGILBY | CAISO | 600 | WITHDRAWN | 2008-05-29 | not published |
| SOLAR FOUR | CAISO | 510 | WITHDRAWN | 2011-03-31 | not published |
| RE AUSTIN | CAISO | 500 | WITHDRAWN | 2010-07-31 | not published |
| YUHA BASIN HYBRID SOLAR ENERGY PROJECT | CAISO | 450 | WITHDRAWN | 2008-05-30 | not published |
| HICKORY SOLAR FARM | CAISO | 400 | WITHDRAWN | 2011-03-31 | not published |
| EL CENTRO 1 | CAISO | 375 | WITHDRAWN | 2007-12-20 | not published |
| SES SOLAR TWO) | CAISO | 300 | WITHDRAWN | 2005-08-31 | not published |
| IMPERIAL SOLAR 1 | CAISO | 280 | WITHDRAWN | 2008-05-30 | not published |
| SILVER LEAF SOLAR | CAISO | 250 | WITHDRAWN | 2010-07-31 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.