Interconnection queue › California › Imperial County › Solar
Solar Projects in Imperial County, California
Snapshot of 2026-09-07 · 37 projects
37 solar projects are in the interconnection queue in Imperial County, California, totaling 8,856 MW across the 37 that publish a capacity.
See what moved in solar in Imperial County, California each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in solar in Imperial County, California, from new entries to projects that came off the list.
Email me solar in Imperial County, California queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 37 | 8,856 MW |
By fuel code, as published
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 37 | 8,856 MW |
By status, as published
| Status | Projects |
|---|---|
| WITHDRAWN | 28 |
| COMPLETED | 7 |
| ACTIVE | 2 |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| SUNCREST IMPERIAL SEGS | CAISO | 1,080 | WITHDRAWN | 2011-03-31 | not published |
| GIGANTES SOLAR | CAISO | 726 | WITHDRAWN | 2016-05-02 | not published |
| SILVER RIDGE MOUNT SIGNAL | CAISO | 600 | ACTIVE | 2006-08-22 | not published |
| OGILBY | CAISO | 600 | WITHDRAWN | 2008-05-29 | not published |
| SOLAR FOUR | CAISO | 510 | WITHDRAWN | 2011-03-31 | not published |
| RE AUSTIN | CAISO | 500 | WITHDRAWN | 2010-07-31 | not published |
| YUHA BASIN HYBRID SOLAR ENERGY PROJECT | CAISO | 450 | WITHDRAWN | 2008-05-30 | not published |
| HICKORY SOLAR FARM | CAISO | 400 | WITHDRAWN | 2011-03-31 | not published |
| EL CENTRO 1 | CAISO | 375 | WITHDRAWN | 2007-12-20 | not published |
| SES SOLAR TWO) | CAISO | 300 | WITHDRAWN | 2005-08-31 | not published |
| IMPERIAL SOLAR 1 | CAISO | 280 | WITHDRAWN | 2008-05-30 | not published |
| SILVER LEAF SOLAR | CAISO | 250 | WITHDRAWN | 2010-07-31 | not published |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.