Snapshot of 2026-08-06 · 24 projects

24 gas projects are in the interconnection queue in Kern County, California, totalling 5,098 MW across the 24 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in gas in Kern County, California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in gas in Kern County, California: what entered, what moved study phase, what came off the list.

Email me gas in Kern County, California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO245,098 MW

By fuel code, as published

FuelProjectsCapacity
Natural Gas245,098 MW

By status, as published

StatusProjects
WITHDRAWN22
ACTIVE1
COMPLETED1

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
BPAE KERN FRONT
ID 195
CAISO725WITHDRAWN2007-04-06not published
LA PALOMA II
ID 402
CAISO600WITHDRAWN2008-05-30not published
GOLDEN HILLS POWER
ID 926
CAISO550WITHDRAWN2012-04-02not published
LA PALOMA PEAKING
ID 404
CAISO450WITHDRAWN2008-05-30not published
HYDROGEN ENERGY CALIFORNIA
ID 300
CAISO400WITHDRAWN2008-02-04not published
WELLHEAD POWER KERN 3
ID 777
CAISO400WITHDRAWN2011-03-31not published
NEW HECA
ID 1037
CAISO300WITHDRAWN2014-04-30not published
TENASKA MOUNTAIN BASIN
ID 938
CAISO300WITHDRAWN2012-04-02not published
HIGHWIND POWER PROJECT
ID 922
CAISO291WITHDRAWN2012-04-02not published
PASTORIA EXPANSION II
ID 134
CAISO200WITHDRAWN2006-10-09not published
PASTORIA EXPANSION
ID 41
CAISO157WITHDRAWN2004-11-18not published
RMU PLANT
ID 101
CAISO100WITHDRAWN2006-04-07not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.