Interconnection queueCalifornia › Kern County

Kern County, California Interconnection Queue

Snapshot of 2026-08-06 · 370 projects · California (CA)

There are 370 projects in the interconnection queue located in Kern County, California (CA), totalling 65,200 MW across the 370 that publish a capacity.

Technology in Kern County

Get told what moves in Kern County, California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Kern County, California: what entered, what moved study phase, what came off the list.

Email me Kern County, California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO37065,200 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
Solar23636,401 MW
Battery6012,796 MW
Wind Turbine449,580 MW
Natural Gas245,098 MW
Other3789 MW
Biofuel116 MW
Flywheel120 MW
Pumped-Storage hydro1500 MW

By status, as published

StatusProjectsCapacity
WITHDRAWN28148,053 MW
COMPLETED465,916 MW
ACTIVE4311,232 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
SANBORN HYBRID 3
ID 1632
CAISO1,400ACTIVE2019-04-15not published
CITY OF VERNON RENEWABLE PROJECT 2
ID 505
CAISO1,100WITHDRAWN2009-07-31not published
CENTRAL VALLEY I SEGS
ID 803
CAISO1,080WITHDRAWN2011-03-31not published
KERN SOLAR RANCH (FKA CALIFORNIA SOLAR RANCH)
ID 680
CAISO1,000WITHDRAWN2011-03-31not published
BUTTONBUSH SOLAR HYBRID ENERGY CENTER
ID 1596
CAISO800ACTIVE2019-04-15not published
BPAE KERN FRONT
ID 195
CAISO725WITHDRAWN2007-04-06not published
CALIFORNIA CITY SOLAR
ID 1320
CAISO700WITHDRAWN2016-05-02not published
PV-47
ID 363
CAISO700WITHDRAWN2008-05-06not published
PV-48
ID 364
CAISO700WITHDRAWN2008-05-06not published
PV-49
ID 400
CAISO700WITHDRAWN2008-05-30not published
CITY OF VERNON RENEWABLE PROJECT 1
ID 504
CAISO688WITHDRAWN2009-07-31not published
ALTA Q175 (FKA ALTA 11)
ID 175
CAISO650WITHDRAWN2007-02-21not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.