Interconnection queue › California › Kern County › Wind
Snapshot of 2026-08-06 · 44 projects
44 wind projects are in the interconnection queue in Kern County, California, totalling 9,580 MW across the 44 that publish a capacity.
Get told what moves in wind in Kern County, California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in wind in Kern County, California: what entered, what moved study phase, what came off the list.
Email me wind in Kern County, California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 44 | 9,580 MW |
| Fuel | Projects | Capacity |
|---|---|---|
| Wind Turbine | 44 | 9,580 MW |
| Status | Projects |
|---|---|
| WITHDRAWN | 33 |
| COMPLETED | 8 |
| ACTIVE | 3 |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| CITY OF VERNON RENEWABLE PROJECT 1 | CAISO | 688 | WITHDRAWN | 2009-07-31 | not published |
| ALTA Q175 (FKA ALTA 11) | CAISO | 650 | WITHDRAWN | 2007-02-21 | not published |
| CPC WEST | CAISO | 600 | ACTIVE | 2006-03-01 | not published |
| CPC EAST | CAISO | 550 | COMPLETED | 2006-03-01 | not published |
| ALTA 15 | CAISO | 502 | WITHDRAWN | 2011-03-31 | not published |
| VOYAGER WIND 2 | CAISO | 500 | COMPLETED | 2006-08-08 | not published |
| AVALON II | CAISO | 500 | WITHDRAWN | 2008-05-30 | not published |
| SOLDIER FLAT | CAISO | 400 | WITHDRAWN | 2011-03-31 | not published |
| NORTH SKY RIVER II WIND | CAISO | 362 | WITHDRAWN | 2006-11-16 | not published |
| BARREN RIDGE II | CAISO | 300 | WITHDRAWN | 2004-07-19 | not published |
| BARREN RIDGE II ALTERNATIVE | CAISO | 300 | WITHDRAWN | 2005-08-22 | not published |
| LOOP RANCH WIND | CAISO | 299 | WITHDRAWN | 2011-03-31 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.