Interconnection queue › California › Merced County
Snapshot of 2026-08-06 · 48 projects · California (CA)
There are 48 projects in the interconnection queue located in Merced County, California (CA), totalling 6,729 MW across the 48 that publish a capacity.
Get told what moves in Merced County, California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Merced County, California: what entered, what moved study phase, what came off the list.
Email me Merced County, California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 48 | 6,729 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 29 | 3,848 MW |
| Battery | 10 | 1,794 MW |
| Wind Turbine | 5 | 502 MW |
| Biofuel | 2 | 11 MW |
| Natural Gas | 2 | 574 MW |
| Status | Projects | Capacity |
|---|---|---|
| WITHDRAWN | 35 | 4,153 MW |
| ACTIVE | 10 | 2,455 MW |
| COMPLETED | 3 | 121 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| WINGTIP SOLAR 1 | CAISO | 1,150 | ACTIVE | 2021-04-15 | not published |
| WINGTIP SOLAR 2 | CAISO | 550 | WITHDRAWN | 2021-04-15 | not published |
| APG WILSON STATION | CAISO | 525 | WITHDRAWN | 2008-04-23 | not published |
| AUSTRALIS | CAISO | 300 | ACTIVE | 2021-04-15 | not published |
| ALMANDE ENERGY STORAGE | CAISO | 250 | WITHDRAWN | 2021-04-15 | not published |
| PERSEUS SOLAR | CAISO | 206 | WITHDRAWN | 2017-05-01 | not published |
| ROMERO CREEK | CAISO | 200 | WITHDRAWN | 2016-05-02 | not published |
| DASOS 10 | CAISO | 200 | WITHDRAWN | 2017-05-01 | not published |
| ROMERO CREEK SOLAR | CAISO | 200 | WITHDRAWN | 2017-05-01 | not published |
| COUGAR STORAGE | CAISO | 200 | ACTIVE | 2021-04-15 | not published |
| WRIGHT SOLAR | CAISO | 200 | ACTIVE | 2011-03-31 | not published |
| MARNIER | CAISO | 150 | WITHDRAWN | 2021-04-15 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.