Interconnection queueCalifornia › Merced County

Merced County, California Interconnection Queue

Snapshot of 2026-08-06 · 48 projects · California (CA)

There are 48 projects in the interconnection queue located in Merced County, California (CA), totalling 6,729 MW across the 48 that publish a capacity.

Technology in Merced County

Get told what moves in Merced County, California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Merced County, California: what entered, what moved study phase, what came off the list.

Email me Merced County, California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO486,729 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
Solar293,848 MW
Battery101,794 MW
Wind Turbine5502 MW
Biofuel211 MW
Natural Gas2574 MW

By status, as published

StatusProjectsCapacity
WITHDRAWN354,153 MW
ACTIVE102,455 MW
COMPLETED3121 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
WINGTIP SOLAR 1
ID 1943
CAISO1,150ACTIVE2021-04-15not published
WINGTIP SOLAR 2
ID 1944
CAISO550WITHDRAWN2021-04-15not published
APG WILSON STATION
ID 341
CAISO525WITHDRAWN2008-04-23not published
AUSTRALIS
ID 1952
CAISO300ACTIVE2021-04-15not published
ALMANDE ENERGY STORAGE
ID 1963
CAISO250WITHDRAWN2021-04-15not published
PERSEUS SOLAR
ID 1387
CAISO206WITHDRAWN2017-05-01not published
ROMERO CREEK
ID 1246
CAISO200WITHDRAWN2016-05-02not published
DASOS 10
ID 1373
CAISO200WITHDRAWN2017-05-01not published
ROMERO CREEK SOLAR
ID 1390
CAISO200WITHDRAWN2017-05-01not published
COUGAR STORAGE
ID 1932
CAISO200ACTIVE2021-04-15not published
WRIGHT SOLAR
ID 779
CAISO200ACTIVE2011-03-31not published
MARNIER
ID 1937
CAISO150WITHDRAWN2021-04-15not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.