Snapshot of 2026-08-06 · 29 projects

29 solar projects are in the interconnection queue in Merced County, California, totalling 3,848 MW across the 29 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in Merced County, California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Merced County, California: what entered, what moved study phase, what came off the list.

Email me solar in Merced County, California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO293,848 MW

By fuel code, as published

FuelProjectsCapacity
Solar293,848 MW

By status, as published

StatusProjects
WITHDRAWN22
ACTIVE6
COMPLETED1

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
WINGTIP SOLAR 1
ID 1943
CAISO1,150ACTIVE2021-04-15not published
AUSTRALIS
ID 1952
CAISO300ACTIVE2021-04-15not published
PERSEUS SOLAR
ID 1387
CAISO206WITHDRAWN2017-05-01not published
DASOS 10
ID 1373
CAISO200WITHDRAWN2017-05-01not published
ROMERO CREEK SOLAR
ID 1390
CAISO200WITHDRAWN2017-05-01not published
WRIGHT SOLAR
ID 779
CAISO200ACTIVE2011-03-31not published
MARNIER
ID 1937
CAISO150WITHDRAWN2021-04-15not published
SPIKES PEAK SOLAR
ID 1958
CAISO150ACTIVE2021-04-15not published
BUTTERCUP HYBRID SOLAR
ID 1970
CAISO130WITHDRAWN2021-04-15not published
SOLAR STAR CALIFORNIA XIII (QUINTO)
ID 577
CAISO110COMPLETED2010-02-01not published
KERRNESS SOLAR
ID 1395
CAISO102WITHDRAWN2017-05-01not published
LAS CAMAS 2
ID 1383
CAISO101WITHDRAWN2017-05-01not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.