Interconnection queue › California › Riverside County › Solar
Snapshot of 2026-08-06 · 82 projects
82 solar projects are in the interconnection queue in Riverside County, California, totalling 19,877 MW across the 82 that publish a capacity.
Get told what moves in solar in Riverside County, California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Riverside County, California: what entered, what moved study phase, what came off the list.
Email me solar in Riverside County, California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 82 | 19,877 MW |
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 82 | 19,877 MW |
| Status | Projects |
|---|---|
| WITHDRAWN | 67 |
| COMPLETED | 11 |
| ACTIVE | 4 |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| PORTHOS SOLAR | CAISO | 900 | WITHDRAWN | 2018-04-16 | not published |
| PALO VERDE MESA (FKA BRIGHTSOURCE MIDPOINT SOLAR) | CAISO | 750 | WITHDRAWN | 2010-07-31 | not published |
| DESERT QUARTZSITE PV | CAISO | 700 | WITHDRAWN | 2007-11-01 | not published |
| MESAVILLE SOLAR | CAISO | 675 | WITHDRAWN | 2017-05-01 | not published |
| SONORAN 2 | CAISO | 520 | WITHDRAWN | 2003-03-18 | not published |
| SUNNYNOOK SOLAR CENTER | CAISO | 500 | WITHDRAWN | 2019-04-15 | not published |
| GRACE ENERGY CENTER | CAISO | 500 | ACTIVE | 2020-04-15 | not published |
| GENESIS MCCOY | CAISO | 500 | COMPLETED | 2007-04-04 | not published |
| DESERT SUNLIGHT PV III | CAISO | 500 | WITHDRAWN | 2007-05-03 | not published |
| BLYTHE SOLEIL | CAISO | 500 | WITHDRAWN | 2008-05-30 | not published |
| GILA SOLAR | CAISO | 500 | WITHDRAWN | 2010-07-31 | not published |
| MESA SOLAR | CAISO | 500 | WITHDRAWN | 2011-03-31 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.