Interconnection queueCalifornia › San Diego County

San Diego County, California Interconnection Queue

Snapshot of 2026-08-06 · 203 projects · California (CA)

There are 203 projects in the interconnection queue located in San Diego County, California (CA), totalling 28,419 MW across the 203 that publish a capacity.

Technology in San Diego County

Get told what moves in San Diego County, California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in San Diego County, California: what entered, what moved study phase, what came off the list.

Email me San Diego County, California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO20328,419 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
Battery8911,138 MW
Natural Gas5510,971 MW
Solar392,144 MW
Wind Turbine142,940 MW
Pumped-Storage hydro21,000 MW
Water140 MW
Biofuel127 MW
Nuclear148 MW
Other1110 MW

By status, as published

StatusProjectsCapacity
WITHDRAWN16523,461 MW
COMPLETED293,401 MW
ACTIVE91,556 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
ENCINA GENERATING PROJECT (PH. 1 AND 2)
ID 5
CAISO900WITHDRAWN2000-08-09not published
SAN DIEGO COMMUNITY POWER GENERATING STATION
ID 8
CAISO750WITHDRAWN2000-11-28not published
SOUTH BAY REPLACEMENT - OPTION 1
ID 27
CAISO650WITHDRAWN2004-02-23not published
RAINBOW ENERGY FACILITY
ID 226
CAISO620WITHDRAWN2007-06-05not published
CHARGER STORAGE
ID 2174
CAISO600WITHDRAWN2021-04-15not published
OTAY MESA GENERATING PROJECT
ID 1A
CAISO550COMPLETED1999-11-01not published
NCI HYBRID POWER
ID 1056
CAISO538WITHDRAWN2014-04-30not published
RAINBOW ENERGY CENTER
ID 1186
CAISO523WITHDRAWN2015-04-30not published
PALOMAR ENERGY PROJECT
ID 4
CAISO521COMPLETED2000-08-08not published
CCI HYBRID POWER
ID 1044
CAISO508WITHDRAWN2014-04-30not published
MIDTOWN CANYON GAS
ID 1178
CAISO507WITHDRAWN2015-04-30not published
SAN VICENTE ENERGY STORAGE FACILITY
ID 1533
CAISO500WITHDRAWN2018-04-16not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.