Interconnection queue › California › San Diego County › Solar
Snapshot of 2026-08-06 · 39 projects
39 solar projects are in the interconnection queue in San Diego County, California, totalling 2,144 MW across the 39 that publish a capacity.
Get told what moves in solar in San Diego County, California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in San Diego County, California: what entered, what moved study phase, what came off the list.
Email me solar in San Diego County, California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 39 | 2,144 MW |
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 39 | 2,144 MW |
| Status | Projects |
|---|---|
| WITHDRAWN | 35 |
| ACTIVE | 2 |
| COMPLETED | 2 |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| NCI HYBRID POWER | CAISO | 538 | WITHDRAWN | 2014-04-30 | not published |
| POWWOW | CAISO | 200 | WITHDRAWN | 2020-04-15 | not published |
| TECATE HYBRID | CAISO | 100 | WITHDRAWN | 2006-06-06 | not published |
| LOS ROBLES | CAISO | 100 | WITHDRAWN | 2012-04-02 | not published |
| KETTLE SOLAR ONE | CAISO | 90 | ACTIVE | 2018-04-16 | not published |
| JORDAN II RENEWABLE POWER PROJECT (20/66MW) | CAISO | 86 | WITHDRAWN | 2010-07-31 | not published |
| BORREGO STARLIGHT 1 | CAISO | 75 | WITHDRAWN | 2008-04-07 | not published |
| RUGGED SOLAR FARM | CAISO | 72 | WITHDRAWN | 2011-03-31 | not published |
| RE PADRE | CAISO | 60 | WITHDRAWN | 2011-03-31 | not published |
| GREENLIGHT SOLAR I | CAISO | 59 | WITHDRAWN | 2008-06-02 | not published |
| WARNER SOLAR I | CAISO | 59 | WITHDRAWN | 2008-06-02 | not published |
| CAMERON SOLAR I | CAISO | 50 | WITHDRAWN | 2008-06-02 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.