Interconnection queue › Massachusetts › Barnstable County
Barnstable County, Massachusetts Interconnection Queue
Snapshot of 2026-09-07 · 33 projects · Massachusetts (MA)
There are 33 projects in the interconnection queue located in Barnstable County, Massachusetts (MA), totaling 2,445 MW across the 25 that publish a capacity.
Technology in Barnstable County
See what moved in Barnstable County, Massachusetts each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in Barnstable County, Massachusetts, from new entries to projects that came off the list.
Email me Barnstable County, Massachusetts queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 33 | 2,445 MW |
By fuel, as published
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here. The national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| SUN BAT | 18 | 104 MW |
| (not published) | 8 | not published |
| BAT | 4 | 993 MW |
| WND | 1 | 15 MW |
| DFO NG | 1 | 333 MW |
| N/A | 1 | 1,000 MW |
By status, as published
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 33 | 2,445 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| HVDC Line | ISO-NE | 1,000 | not published | 2/16/2015 | 6/1/2020 |
| Battery Storage | ISO-NE | 500 | not published | 5/28/2024 | 12/1/2028 |
| Canal 3 | ISO-NE | 333 | not published | 3/4/2014 | 6/15/2019 |
| Battery Storage | ISO-NE | 200 | not published | 12/30/2021 | 12/31/2024 |
| Energy Storage | ISO-NE | 150 | not published | 11/21/2017 | 12/31/2021 |
| Battery Storage | ISO-NE | 143 | not published | 3/1/2018 | 5/31/2021 |
| Group @ Hatchville 936 - EMA ASO | ISO-NE | 18 | not published | 6/8/2022 | 11/30/2023 |
| Wind | ISO-NE | 15 | not published | 12/21/2010 | 11/30/2012 |
| Eversource Group @ Sandwich 916 | ISO-NE | 12 | not published | 4/9/2020 | 11/30/2023 |
| Group @ Orleans 975 - EMA ASO | ISO-NE | 10 | not published | 6/8/2022 | 11/30/2023 |
| Eversource Group @ Valley 715 | ISO-NE | 10 | not published | 4/9/2020 | 11/30/2023 |
| Eversource Group @ Falmouth 993 | ISO-NE | 8 | not published | 4/9/2020 | 11/30/2023 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.