Interconnection queue › Massachusetts › Barnstable County › Hybrid
Hybrid Projects in Barnstable County, Massachusetts
Snapshot of 2026-09-07 · 18 projects
18 hybrid projects are in the interconnection queue in Barnstable County, Massachusetts, totaling 104 MW across the 18 that publish a capacity.
See what moved in hybrid in Barnstable County, Massachusetts each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in hybrid in Barnstable County, Massachusetts, from new entries to projects that came off the list.
Email me hybrid in Barnstable County, Massachusetts queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 18 | 104 MW |
By fuel code, as published
| Fuel | Projects | Capacity |
|---|---|---|
| SUN BAT | 18 | 104 MW |
By status, as published
| Status | Projects |
|---|---|
| (not published) | 18 |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Group @ Hatchville 936 - EMA ASO | ISO-NE | 18 | not published | 6/8/2022 | 11/30/2023 |
| Eversource Group @ Sandwich 916 | ISO-NE | 12 | not published | 4/9/2020 | 11/30/2023 |
| Group @ Orleans 975 - EMA ASO | ISO-NE | 10 | not published | 6/8/2022 | 11/30/2023 |
| Eversource Group @ Valley 715 | ISO-NE | 10 | not published | 4/9/2020 | 11/30/2023 |
| Eversource Group @ Falmouth 993 | ISO-NE | 8 | not published | 4/9/2020 | 11/30/2023 |
| Hyannis 961 - EMA ASO | ISO-NE | 5 | not published | 6/8/2022 | 11/30/2023 |
| Solar + Battery Storage | ISO-NE | 5 | not published | 4/23/2021 | 12/31/2021 |
| ENA Old Falmouth Road PV + Storage | ISO-NE | 5 | not published | 4/28/2020 | 8/8/2024 |
| Sandwich 916 - EMA ASO | ISO-NE | 5 | not published | 6/8/2022 | 11/30/2023 |
| Wellfleet 976 - EMA ASO | ISO-NE | 4 | not published | 6/8/2022 | 11/30/2023 |
| Solar + Battery Storage | ISO-NE | 4 | not published | 4/21/2021 | 2/28/2022 |
| Harwich 968 - EMA ASO | ISO-NE | 4 | not published | 6/8/2022 | 11/30/2023 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.