Interconnection queue › Massachusetts › Plymouth County
Snapshot of 2026-08-06 · 50 projects · Massachusetts (MA)
There are 50 projects in the interconnection queue located in Plymouth County, Massachusetts (MA), totalling 7,056 MW across the 43 that publish a capacity.
Get told what moves in Plymouth County, Massachusetts
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Plymouth County, Massachusetts: what entered, what moved study phase, what came off the list.
Email me Plymouth County, Massachusetts queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 50 | 7,056 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| SUN BAT | 18 | 294 MW |
| BAT | 9 | 990 MW |
| N/A | 5 | 3,220 MW |
| SUN | 5 | 32 MW |
| (not published) | 4 | not published |
| DFO NG | 3 | 1,202 MW |
| NG | 3 | 1,308 MW |
| NUC | 2 | 0 MW |
| WND | 1 | 10 MW |
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 50 | 7,056 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| HVDC from ME to MA (MA import only) | ISO-NE | 1,200 | not published | 10/16/2015 | 12/31/2021 |
| HVDC Line | ISO-NE | 1,000 | not published | 2/16/2015 | 6/1/2020 |
| 1000 MW HVDC (import only) | ISO-NE | 1,000 | not published | 4/21/2017 | 12/31/2022 |
| Combined Cycle | ISO-NE | 898 | not published | 2/9/2009 | 3/1/2015 |
| Combined Cycle | ISO-NE | 870 | not published | 5/28/2015 | 5/1/2020 |
| Combined Cycle | ISO-NE | 410 | not published | 10/16/2009 | 5/1/2015 |
| Brockton Combined Cycle | ISO-NE | 332 | not published | 11/2/2006 | 5/31/2019 |
| Battery Storage | ISO-NE | 189 | not published | 3/16/2021 | 5/14/2027 |
| Battery Storage | ISO-NE | 189 | not published | 3/16/2021 | 5/14/2027 |
| Cranberry Point Energy Storage | ISO-NE | 150 | not published | 3/21/2018 | 5/16/2025 |
| Battery Storage | ISO-NE | 150 | not published | 1/4/2019 | 12/1/2021 |
| Battery Storage | ISO-NE | 150 | not published | 4/26/2019 | 5/31/2026 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.