Interconnection queueMassachusettsPlymouth County › Hybrid

Hybrid Projects in Plymouth County, Massachusetts

Snapshot of 2026-08-06 · 18 projects

18 hybrid projects are in the interconnection queue in Plymouth County, Massachusetts, totalling 294 MW across the 18 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in hybrid in Plymouth County, Massachusetts

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in hybrid in Plymouth County, Massachusetts: what entered, what moved study phase, what came off the list.

Email me hybrid in Plymouth County, Massachusetts queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE18294 MW

By fuel code, as published

FuelProjectsCapacity
SUN BAT18294 MW

By status, as published

StatusProjects
(not published)18

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
Eversource Group Study @ Wareham
ID 977
ISO-NE55not published3/25/202011/30/2023
Eversource Group @ Wareham 714
ID 1007
ISO-NE48not published4/9/202011/30/2023
Eversource Group @ West Pond 737
ID 1008
ISO-NE44not published4/9/202011/30/2023
Eversource Group @ Tremont Substation 713
ID 1005
ISO-NE34not published4/9/202011/30/2023
Eversource Group @ Rochester #745
ID 1003
ISO-NE25not published4/9/202011/30/2023
Eversource Group Study @ Crystal Spring
ID 975
ISO-NE20not published3/25/202011/30/2023
EE 2024 SEMA/Cape ASO Group Study
ID 1533
ISO-NE17not published5/8/202412/31/2026
Eversource Group Study @ Brook St
ID 973
ISO-NE10not published3/25/202011/30/2023
Group @ Duxbury 738 - EMA ASO
ID 1275
ISO-NE7not published6/8/202211/30/2023
EE 2024 SEMA/Cape ASO Group Study
ID 1532
ISO-NE5not published5/8/202412/31/2026
Tremont 713 - EMA ASO
ID 1286
ISO-NE5not published6/8/20227/31/2025
EE 2024 SEMA/Cape ASO Group Study
ID 1531
ISO-NE5not published5/8/202412/31/2024

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.